A worker reported its labels and nothing about the machine behind them, so the
engine could route a node to a GPU box but not tell whether that box had a GPU
free. Inventory — cores, GPUs, memory — now arrives with the hello frame, and
the run frame carries back what the engine allocated for that call.
Which is protocol 2 on both ends. GPUs are never probed: asking a vendor tool
would make the one dependency two, so a GPU is what the batch job says it was
given or what --gpus says. A worker that reports nothing still attaches and is
scheduled by its label alone.
Two things a job scheduler needs: --max-idle stops a worker started for one job
rather than letting it hold its allocation to the walltime, and a refusal is now
fatal instead of a reconnect loop that reads as a hang in a job's log.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01A6HeySA27EkGANZN95QySW