Commit Graph
2 Commits
Author SHA1 Message Date
stroblmeandClaude Fable 5 93b4a9a0b1 Step a paused flow, and deliver what a rate limit held back
Three things a pause and an interval were quietly losing:

- A rebuild builds a fresh pipeline, so nothing is paused any more and no
  resume ever comes for what the old one parked. Release it on rebuild.
- POST /flows/{name}/step takes the oldest parked item and runs that one wave
  while the flow stays paused, so a held-back cascade can be walked through.
  Nothing parked answers plainly rather than failing.
- A per-port interval was leading-edge only: a producer going quiet inside the
  window left the consumer on the value before it. The held value is kept and
  a flush item scheduled on the queue's existing timer, so the window ends with
  a delivery. One timer in flight per node, and none without a queue to run it.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01H7LwYgJfpkbLCTeiAf8U4A
2026-08-16 16:44:17 +02:00
Melvin StroblandClaude Fable 5 7344eac262 Start, stop and pause flows, and show what their nodes print
Flows can now be taken off the engine and put back. Stopped state lives in a
runtime.json beside the flow, not in the flow document: the canvas autosaves
that document, so a stopped flow would otherwise start itself again on the
next edit. A stopped flow gets no subscriptions, schedules or webhooks, its
nodes are skipped by the scheduler, and running it answers 409. Pausing holds
a flow's nodes while its values keep arriving, so the canvas still shows what
is coming in.

Node code is user code and print is how it says things, so stdout is teed
through a contextvar sink active only during a node execution — one event per
execution, capped, so a chatty node cannot outrun the stream. A node that
fails sends its traceback the same way, trimmed to the author's own frames.
The dock gains a logs panel and a pause control; the dashboard replaces its
placeholder with what is running, stopped or failing; the edge inspector can
send the last message again.

Single-stepping is deferred and noted: the scheduler keeps no progress between
calls, so a step button would re-run the same node rather than advance.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-15 23:35:08 +02:00