Notepad: a flow toggle rebuilds the whole pipeline
Timed at 8-10s on the tinyhouse installation, which is why the runtime spec's 5s assertion fails there and passes on a small instance.
This commit is contained in:
@@ -58,6 +58,15 @@ Deferring because out of scope is fine, but don't mention deferring than.
|
||||
zero rather than as unknown — which is how a deleted `failures_24h` showed as "0 failures"
|
||||
unnoticed. The per-card half is one line; Home sums across installations and has nowhere to
|
||||
say "3 of 4 reporting", so the two want doing together.
|
||||
- PERF/API: enabling or disabling one flow calls `FlowController.reload()`, which tears down
|
||||
and rebuilds *every* flow — reconnecting each node, including the ones that talk to hardware
|
||||
over the network. On the tinyhouse installation (nineteen flows, MQTT + UniFi + aircon) a
|
||||
single toggle takes 8-10s end to end. Same root as the seeding cost below: there is no way
|
||||
to change one flow's runtime state without rebuilding the whole pipeline.
|
||||
- CHORE/TEST: `runtime.spec.ts` "the home page lists flows and can stop one" asserts the row
|
||||
reads "Stopped" within Playwright's 5s default. That is shorter than a real installation's
|
||||
rebuild (above), so the spec passes on a small instance and fails on a populated one. It is
|
||||
the rebuild that wants fixing, not the timeout — raising it would only hide the cost.
|
||||
- FEAT/SEC: `locked` is a read-only surface, not a permission — the server accepts a publish
|
||||
from a panel whose dashboard says locked. Making it real means carrying the flag into
|
||||
`_panel_may`.
|
||||
|
||||